The Solution
A major restoration project to preserve this important historic monument and focal point of the local community
Phase 1 - which is planned to commence in 2010, will be the structural works to the tower.
THE TOWER - £176,000
New lead roof and timber repairs including strengthening of floors. £40,000
External stonework repairs and repointing flintwork and stone wall faces £95,000
Repairs to the bells and bell frame £26,000
Scaffolding and temporary roof for 16 weeks £15,000
Phase 2 - will be the works to the tower balcony and catering facilities.
RUNNING WATER AND CATERING FACILITIES - £20,000
Extend mains water supply into the church and install small kitchen area
Phase 3 – will be the repairs to the windows, floor and electrical/heating - £45,000
Repairing stain glass windows £10,000
Upgrade potentially dangerous electrics including improving the heating to the Chancel £5,000
Installation of a safety rail along the upper gallery at the front and a glass barrier at the back £20,000
Filling in of redundant heating ducts and carrying out re-flooring and essential repairs £10,000
Phase 4 - Internal decoration - £28,000
Redecoration of the nave ceiling and of the chancel and nave including scaffolding
PROFESSIONAL FEES 10% £28,775
CDM Planning Supervisor, Consultant Civil and Structural Engineers and Historic Buildings Consultant
COME AND SING "SONGS FROM THE SHOWS"
Conducted by
JONATHAN BROWN (Director of
SATURDAY 4TH SEPTEMBER
Rehearsal 2.30pm Performance 7.00pm
Hampstead Norreys Village Hall
followed by refreshments
Tickets: (including food and a glass of wine) Audience £10 Under 11s £2.50
Fill in a ticket application form on-line by clicking here Please book early to avoid disappointment
Please note that all singing places have now been taken!
ALL ABILITIES WELCOME! or just come to listen to the performance
Further information available from Mrs. C Saunders 01635 200222
You can download the Fundraising Prospectus by clicking here